Jump to content

Don't Miss a Beat

Join the UK's most passionate festival community. Keep up with the latest conversations, line-up rumours, and music news.

250,000+ Members

Connect with a massive network of fellow festival-goers.

Lively Discussions

Thousands of active topics on music, campsites, and tips.

Hot Rumours & News

Hear about secret sets and lineup drops before anyone else.

Create Free Account
OR
  • Sign Up!

    Join our friendly community of music lovers and be part of the fun 😎

Site Changes - What do we know?


stuartbert two hats

Recommended Posts

The spider is great and all, but how many times do you realistically want to keep seeing it? The main stages all gradually evolve and change, the crane might not be as good now but I’d rather things were changed up regularly. You could probably say the same about some of the things in the SE corner, they’re fantastic in isolation, but do you really want them trotted out every year ad Infinitum? Obviously you can’t change everything at once, but I think something that’s been around for 10+ years should be looked at as being replaceable.

Link to comment
Share on other sites

17 minutes ago, Deaf Nobby Burton said:

The spider is great and all, but how many times do you realistically want to keep seeing it? The main stages all gradually evolve and change, the crane might not be as good now but I’d rather things were changed up regularly. You could probably say the same about some of the things in the SE corner, they’re fantastic in isolation, but do you really want them trotted out every year ad Infinitum? Obviously you can’t change everything at once, but I think something that’s been around for 10+ years should be looked at as being replaceable.

Very sensible and completely true, but there were several hundred things I’d have fucked with before the spider… Is there anything off limits to change? Pyramid stage? 

Link to comment
Share on other sites

9 minutes ago, whitehorses said:

Very sensible and completely true, but there were several hundred things I’d have fucked with before the spider… Is there anything off limits to change? Pyramid stage? 

I think the pyramid stage is completely off limits as it’s so iconic, although that’s not to say they couldn’t remake it larger, or change it somehow but keeping the same shape. Everything else as good as it might be I think needs to have some sort of shelf life.

Link to comment
Share on other sites

6 minutes ago, Deaf Nobby Burton said:

I think the pyramid stage is completely off limits as it’s so iconic, although that’s not to say they couldn’t remake it larger, or change it somehow but keeping the same shape. Everything else as good as it might be I think needs to have some sort of shelf life.

👍 

 

Link to comment
Share on other sites

9 hours ago, crazyfool1 said:

I’ve just heard that the crane will be replaced by the spider this year … 

I posted this a few weeks back - the planning was refused for the crane, as was the appeal. Yes, the base is still there at the moment but what’s the point in it ‘evolving’ for one more festival? 

Also, Arcadia team are working on another project that they are calling their ‘new roots’ and while it looks smaller scale it might have guided their Glastonbury decisions.

Link to comment
Share on other sites

1 minute ago, stuie said:

I posted this a few weeks back - the planning was refused for the crane, as was the appeal. Yes, the base is still there at the moment but what’s the point in it ‘evolving’ for one more festival? 

Also, Arcadia team are working on another project that they are calling their ‘new roots’ and while it looks smaller scale it might have guided their Glastonbury decisions.

Wasn’t it just refused for them to leave most of it up permanently? Nothing to stop them having it up during the festival, it just has to mostly be taken down at the end of it. Not ideal but equally it doesn’t make it unviable.

Link to comment
Share on other sites

1 minute ago, Deaf Nobby Burton said:

Wasn’t it just refused for them to leave most of it up permanently? Nothing to stop them having it up during the festival, it just has to mostly be taken down at the end of it. Not ideal but equally it doesn’t make it unviable.

looking at the cost in the electronic thread it makes it pretty unviable 

Link to comment
Share on other sites

18 minutes ago, sedra said:

The body of Pangea was definitely there last summer when we went to worthy farm camping - it was painted green so it blended in with the landscape 

As best as you can blend an shipping ports industrial dock crane into the Somerset countryside...🤣

.

Link to comment
Share on other sites

8 minutes ago, stuie said:

I posted this a few weeks back - the planning was refused for the crane, as was the appeal. Yes, the base is still there at the moment but what’s the point in it ‘evolving’ for one more festival? 

Also, Arcadia team are working on another project that they are calling their ‘new roots’ and while it looks smaller scale it might have guided their Glastonbury decisions.

apologies i missed that ... and yep you are right 

Link to comment
Share on other sites

5 minutes ago, Deaf Nobby Burton said:

Wasn’t it just refused for them to leave most of it up permanently? Nothing to stop them having it up during the festival, it just has to mostly be taken down at the end of it. Not ideal but equally it doesn’t make it unviable.

Yes, Arcadia say themselves in the planning documents that full installation and removal is too costly for this method to be viable.

Link to comment
Share on other sites

16 minutes ago, Deaf Nobby Burton said:

I think the pyramid stage is completely off limits as it’s so iconic, although that’s not to say they couldn’t remake it larger, or change it somehow but keeping the same shape. Everything else as good as it might be I think needs to have some sort of shelf life.

The only things they might want to touch being the view screens in that field or the travel routes through the back during busy periods, which was actually officially noted in the 2019 review for the council- so expect that may change.

Link to comment
Share on other sites

22 minutes ago, Deaf Nobby Burton said:

I think the pyramid stage is completely off limits as it’s so iconic, although that’s not to say they couldn’t remake it larger, or change it somehow but keeping the same shape. Everything else as good as it might be I think needs to have some sort of shelf life.

And the tree directly behind the pyramid is of great significance to the Eavis family. 

Link to comment
Share on other sites

6 minutes ago, stuie said:

Yes, Arcadia say themselves in the planning documents that full installation and removal is too costly for this method to be viable.

Seems a bit strange, it’s not like the spider doesn’t have to be assembled and reassembled either which presumably has a cost attached to it as well. The worlds gone mad if it costs £300k to assemble an old crane.

Edited by Deaf Nobby Burton
Link to comment
Share on other sites

2 minutes ago, Leyrulion said:

The only things they might want to touch being the view screens in that field or the travel routes through the back during busy periods, which was actually officially noted in the 2019 review for the council- so expect that may change.

It’s hard to see how they could improve the latter given the geography of the site. If they can find a way though that would be great. Flow of people through the Pyramid field is a mess… maybe some sort of one way system? Tricky not to create more problems than it solves though. 🤷‍♂️

Link to comment
Share on other sites

7 minutes ago, Deaf Nobby Burton said:

Seems a bit strange, it’s not like the spider doesn’t have to be assembled and reassembled either which presumably has a cost attached to it as well. The worlds gone mad if it costs £300k to assemble an old crane.

I’m not sure. The crane must involve cutting and welding I guess.  The spider is just a free standing structure, not anchored into the ground. 

Link to comment
Share on other sites

41 minutes ago, Deaf Nobby Burton said:

Seems a bit strange, it’s not like the spider doesn’t have to be assembled and reassembled either which presumably has a cost attached to it as well. The worlds gone mad if it costs £300k to assemble an old crane.

Have a read of the 300+ pages or the second planning document.
It's the 'ARCADIA REPORT'.

https://publicaccess.mendip.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=Q6YWYWKPL7T00

 

£265,000 to put it up and take it down in one year. Costs include staff, multiple cranes to assemble/dissemble, plus and probably one of the key points of needing re-commissioning and re-certification each year, so they are legally compliant.

 

Edited by Dukeicon
Link to comment
Share on other sites

10 minutes ago, Dukeicon said:

Have a read of the 300+ pages or the second planning document.

https://publicaccess.mendip.gov.uk/online-applications/files/F70FE26924D52FBD0BD57A8EDAEC8274/pdf/2020_0548_FUL-ARCADIA_REPORT-392661.pdf

£265,000 to put it up and take it down in one year. Costs include staff, multiple cranes to assemble/dissemble, plus and probably one of the key points of needing re-commissioning and re-certification each year, so they are legally compliant.

 

Any idea how much it costs to put up the spider?

Link to comment
Share on other sites

11 minutes ago, Dukeicon said:

Have a read of the 300+ pages or the second planning document.

https://publicaccess.mendip.gov.uk/online-applications/files/F70FE26924D52FBD0BD57A8EDAEC8274/pdf/2020_0548_FUL-ARCADIA_REPORT-392661.pdf

£265,000 to put it up and take it down in one year. Costs include staff, multiple cranes to assemble/dissemble, plus and probably one of the key points of needing re-commissioning and re-certification each year, so they are legally compliant.

 

The link doesn’t work, but presumably if you’re trying to win planning argument, then the cost of not getting your own way will be somewhat inflated as a means to win such argument?

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    • No registered users viewing this page.

  • Latest Activity

    • Sam Fender   Radiohead    Depeche Mode    Legends slot - Cher    That's my guess for 2027 
    • Alkaline Trio 90 Barrington Levy 95 Basement Jaxx 120 Billy Bragg 100 Billy Ocean 100 The Black Keys 90 Carl Cox 100 Chase & Status 110 Chelsea Wolfe 85  CMAT 105 Confidence Man 150 MAX Dave 65 David Byrne 145 Disclosure 75 Everything Everything 105 Faithless 80  Fatboy Slim 100 Four Tet 110  Funeral for a Friend 55 Garbage 100 GOAT 105  Greentea Peng 120 Happy Mondays 80 Hollie Cook 90 Jorja Smith 100 José González 100 Joy Crookes 120  Judas Priest 90 Kasabian 80  Kneecap 110  The Last Dinner Party 25 Levellers 85  Limp Bizkit 35  Linkin Park 90 Lorde 120 Madness 75  The Maccabees 100 Neck Deep 135  Nile Rodgers & Chic 100 Overmono 100 Pixies 65 The Prodigy 130  Pulp 150 MAX RAYE 100 Ren 85 Richard Ashcroft 85 Say She She 85 Scissor Sisters 110  Self Esteem 120 Skunk Anansie 100 Stereolab 120  The Streets 110 Super Furry Animals 110 Tems 50  Thundercat 90 Tom Jones 90  Two Door Cinema Club 30  Tyler, the Creator 75 Underworld 105 Wet Leg 90  Wilco 85 (-10) The Wombats 90 Wolf Alice 135
    • If you didn't see melt banana at Apolo. Go see them at the festival. Insane. 
  • Featured Products

  • Hot Topics

  • Latest Tourdates

×
×
  • Create New...