Jump to content

Don't Miss a Beat

Join the UK's most passionate festival community. Keep up with the latest conversations, line-up rumours, and music news.

250,000+ Members

Connect with a massive network of fellow festival-goers.

Lively Discussions

Thousands of active topics on music, campsites, and tips.

Hot Rumours & News

Hear about secret sets and lineup drops before anyone else.

Create Free Account
OR
  • Sign Up!

    Join our friendly community of music lovers and be part of the fun 😎

Peter Dow


Guest Uncle Liam

Recommended Posts

Satirical take on the desperate efforts of United Kingdom supporters proposing an devolution-maximum or devolution-plus alternative to the SNP's preferred option for a Scottish parliament approved referendum of the people of Scotland in support of an independent Queen's state of Scotland.

Either way the referendum will be rigged to keep the Queen and deny real Scottish national independence.

Link to comment
Share on other sites

  • 1 month later...
  • Replies 865
  • Created
  • Last Reply

Top Posters In This Topic

Hydro dam energy stores for 100% renewable power

In future, we won't need any coal, oil or gas burning or nuclear power stations, at all.

All we'll need to generate all the electrical power we'll ever need is renewable energy from wind, tidal, wave, solar and other renewable sources of energy and a good place to store our surplus renewable energy for later use.

A good way to store energy where you have steep hills and water is to build pumped-storage hydroelectricity dams, reservoirs and power stations.

Scotland is such a place with plenty of steep hills and water. Scotland is the land of the mountain and the flood. So where better to develop the art of building pumped storage hydro?

Scotland best for pumped-storage hydroelectricity energy economy

This is a statement of the obvious as far as Scottish electrical power-generation engineers and scientists are concerned I expect but I am making this statement anyway, not for the benefit of our scientists or engineers but to inform the political debate about the potential of the Scottish economy "after the North Sea oil runs out" because political debate involves mostly non-scientists and non-engineers who need to have such things explained to them.

The Scottish economy has a profitable living to make in future in the business of electrical energy import/export from/to English electrical power suppliers and perhaps even to countries further away one day.

The tried and tested engineering technology we Scots can use in future to make money is pumped-storage hydroelectricity.

Wikipedia: Pumped-storage hydroelectricity

The technique is currently the most cost-effective means of storing large amounts of electrical energy on an operating basis, but capital costs and the presence of appropriate geography are critical decision factors.

Edited by Peter Dow
Link to comment
Share on other sites

My vision for a LARGER hydro dam at Coire Glas, Scotland than SSE's

I am presenting here my vision for a large pumped storage hydroelectric 2-square kilometres surface-area reservoir and 300+ metre tall dam which I have designed for the Coire Glas site, Scotland.

(View site using Google Earth where the convenient label is "Loch a' Choire Ghlais" )

I was inspired to conceive and to publish my vision by learning of the Scottish and Southern Energy (SSE) proposal to build a smaller hydroelectric pumped-storage scheme at Coire Glas which has been presented to the Scottish government for public consultation.

I have not long been aware of the SSE plan for the Coire Glas scheme, not being a follower of such matters routinely, but I was prompted by an earlier tangentially-related news story (about energy storage technology for renewable energy generators such as wind farms) to write to Members of the Scottish Parliament on the merits and urgency of new pumped storage hydroelectric power for Scotland on 14th February and a reply from Ian Anderson, the parliamentary manager for Dave Thomson MSP received the next day, the 15th February informed me about the SSE plan and Ian added "initially scoped at 600MW but, to quote SSE, could be bigger!"

I replied to Ian "So the schemes proposed by the SSE are welcome and ought to be green-lighted and fast-tracked, but I am really proposing that Scots start thinking long term about an order of magnitude and more greater investment in pumped storage hydroelectric capacity than those SSE plans."

So I had in mind "bigger would be better" but it was not until the next day on the 16th February when a news story informed me that the SSE plans had been submitted to the Scottish government for public consultation that I thought "this needs consideration now".

So starting late on the night of the 17th, early 18th February and all through the weekend, I got busy, outlining my alternative vision for a far bigger dam and reservoir at the same location.

So this is my vision as inspired by the SSE plan. If my vision is flawed then the fault is mine alone. If my vision is brilliant, then the brilliance too is mine. :D

peterdowcoireglasproposal.jpg

peterdowcorieglasproposal.jpg

Image also hosted on postimage

The black contour line at 550 metres elevation shows the outline of the SSE proposed reservoir of about 1 square kilometre surface-area and the grey thick line shows the position of the proposed SSE dam which would stand 92 metres tall and would be the tallest dam in Scotland and indeed Britain to date though it seems our dams are several times smaller than the tallest dams elsewhere in the world these days.

Part of the red contour line at 775 metres elevation, where the red line surrounds a blue shaded area, blue representing water, shows the outline of my larger reservoir of about 2 square kilometres surface-area and the thicker brown line shows the position of my proposed dam which would stand 317 metres tall which would be one of the tallest man-made dams in the world, 1475 metres long and about 72 million cubic metres in volume.

Enhanced satellite photograph

enhancedsatellite.jpg

enhancedsatellite.jpg

Image also hosted on PostImage.Org

Edited by Peter Dow
Link to comment
Share on other sites

Cross section of the Dow-dam

The Dow-dam would be more than 3 times higher than the proposed SSE-dam. In this diagram, a horizontal line one third of the way up the Dow-dam indicates the relative height of the SSE dam although it is not aligned with this cross-section.

dowdam.jpg

dowdam.jpg

Image also hosted on PostImage.Org

Maps showing the line of cross-section viewed from each side

damwatersidemap700.jpg

damwatersidemap700.jpg

Image also hosted on PostImage.Org

Link to comment
Share on other sites

damdrysidemap700.jpg

damdrysidemap700.jpg

Image also hosted on PostImage.Org

Cross section of the Dow-dam reservoir

damcrosssectionmajordiameter.jpg

Cross section along the major diameter of the elliptical excavation of the reservoir bed

damcrosssectionmajordiameter.jpg

Also hosted on PostImage.org

The Upper Reservoir

The green ellipse of major diameter of 1.5 kilometres and minor diameter of 1 kilometre represents an excavated reservoir bed, as flat and as horizontal as practical, at an elevation of 463 metres.

Since an excavated reservoir bed is not, that I can see, part of the SSE plan, at any size, I will provide some more information about my vision for that now.

The basic idea of excavating a flat or flattish reservoir bed is to increase the volume of the water stored in the reservoir because more water means more energy can be stored.

Capacity of the reservoir, energy stored and power supplied

Excavating around 138 million cubic metres of rock increases the volume of the reservoir so created to about 400 million cubic metres, achieving a theoretical energy storage capacity of more than 600 GigaWatt-Hours and it ought to be possible to excavate enough rock to achieve a practical 600GW.Hrs electrical energy supplied.

Accordingly, I envision it would be appropriate and useful to install the required turbine-pumps to supply up to 12 GigaWatts of electrical power to the grid for up to 50 hours before the energy store would be exhausted.

Excavation details

Depending on the geology and strength of the rock of Coire Glas the walls of the reservoir bed perimeter could be as steep as vertical from the reservoir bed up to the natural elevation of the existing rock surface which would mean, presumably, blasting out rock to create a cliff which at places could be as much as about 290 metres tall.

Near the dam, the reservoir bed perimeter wall would be only 40 metres or less tall. The further from the dam, the higher the wall will be and the more rock needs to be excavated.

A vertical reservoir bed perimeter wall would be ideal to maximise reservoir volume wherever the geology provides a strong stone which can maintain a vertical wall face without collapse, (a stone such as granite perhaps). Ideally this would allow about 138 million cubic metres to be excavated to flatten the reservoir bed.

Where the geology only provides a weaker stone then a sloping perimeter wall at a suitable angle of repose for reliable stability would be constructed.

So the reservoir perimeter wall could be as sloped as shallow as 45 degrees from the natural elevation at the perimeter of the eclipse sloping down to the reservoir bed at 463 metres elevation in the case of the weakest and most prone to collapse kinds of stone.

Exactly how strong the stone is at each location I guess we'll only find out absolutely for sure if and when engineers start blasting it and testing the revealed rock wall face for strength.

The shape of the perimeter of the excavated reservoir bed is not absolutely critical. So long as it ends up as a stable wall or slope, however it is shaped by the blasting, it will be fine. There is no need to have stone masons chip the perimeter smooth and flat! The ellipse is simply the easiest approximate mathematical shape to describe and to draw. If the end result is not a perfect ellipse, don't worry, it will be fine!

Link to comment
Share on other sites

Loch Lochy and vicinity water flow control works

Here is an annotated satellite photograph of the land south from Coire Glas showing Loch Lochy, Loch Arkaig, the isthmus between the lochs, Mucomir where Loch Lochy empties into the River Spean before it flows on as the River Lochy, the Caledonian Canal and Fort William where the river flows into a sea loch.

lochywater768.jpg

lochywater768.jpg

Click to see larger image

New waterway

Loch Lochy is separated from a neighbouring loch, Loch Arkaig, by a 2 km wide isthmus, which I have identified on this map as "the Achnacarry Bunarkaig isthmus", after the local place names.

It ought to be quite straight forward to build a canal or culvert, to connect those two lochs. The idea is that the new waterway would be wide and deep enough, enough of a cross section area under water, perhaps hundreds of square metres, so as to allow free flow from one loch to the other, so as to equalise the surface elevations of the two lochs, so as to increase the effective surface area of Loch Lochy so as to decrease the depth changes to Loch Lochy when water flows in from the Coire Glas reservoir when it discharges water when supplying power.

Now, Loch Arkaig has a natural surface elevation of 43 metres and this would be lowered to that of Loch Lochy. The surface area of Loch Arkaig is given by wikipedia as 16 km^2 also, (though it looks to me somewhat smaller than Loch Lochy). In addition, partially draining Loch Arkaig to bring its level down to that of Loch Lochy will also reduce its surface area.

If say, the additional surface area of Loch Arkaig is about 10 km^2 added to Loch Lochy's 16 km^2 this would give an effective surface area of 26 km^2 and reduce the potential depth variation to

Potential depth variation of Loch Lochy + Loch Arkaig = 400 000 000 m^3 / 26 000 000 m^2 = 15.3 metres.

Without equalising the loch levels, the depth changes to Loch Lochy that would require to be managed may be potentially more like 25 metres than 15 metres. So the new waterway is an important part of the new water flow control works that Coire Glas/Dow requires to be constructed.

Additional Loch Lochy water level control measures

When the Coire Glas reservoir is full, then the water level of Loch Lochy should be prevented, by new water works - drains, dams, flood barriers etc. - from rising due to rainfall and natural flow into the loch above a safe level which allows for the reservoir to empty into the loch without overflowing and flooding.

The safe "upper-reservoir-full" loch level will likely turn out to be around about 15 metres below the maximum loch level.

The next diagram showing the new loch drain and the reservoir pump inlets indicates how this might be achieved.

lochyflow768.jpg

lochyflow.jpg

Click to see larger image

The drain from Loch Lochy to the sea which goes underground from the 14 m elevation level in the loch would need capacity for the usual outflow from Loch Lochy which currently goes through the Mucomir hydroelectric station.

I have estimated the flow through Mucomir from its maximum power of 2MegaWatts and its head of 7m as somewhere near 0.2 Mega-cubic-metres-per-hour and compared that value using a spreadsheet I have written to predict the capacity of water flow through different sizes of drains using the empirical Manning formula and this is also useful for determining the appropriate size of the new water channel between the lochs.

Ease my quantity :D

To construct Coire Glas/Dow/600GW.Hrs/12GW may cost of the order of around £20 billion, but that would be my order of magnitude educated guess more than a professional cost estimate.

In other words, I'm only really confident at this early "vision" stage that the cost would be closer to £20 billion than it would be to £2 billion or to £200 billion but I'm not claiming to be able to quote an accurate cost estimate at this stage.

I have not itemised my costs - how much for land, how much for labour, how much for trucks, how much for diggers, how much for cement, how much to install the generators etc. and the SSE have not published itemised costs for theirs either so I can't calculate my costs in a proportion to the SSE's costs.

Although my version offers 600 GigaWatt-Hours energy and 12 GigaWatts power (or 20 times the capacity and performance) some of the items in my version would cost more than "in proportion", in other words more than 20 times the SSE's cost.

For example, the cost of my dam will be more like 27 times the cost of the SSE's dam. (3.44 times higher and thicker and 2.27 times longer).

For example, the cost of excavating 400 million tonnes of rock from the reservoir bed to increase the capacity of the reservoir to hold water (and energy) in my version won't be in proportion to the SSE costs for excavating their reservoir bed because, as far as I know, they don't plan to excavate their reservoir bed at all.

On the other hand, my land costs are about the same as the SSE's - much less than in proportion. I may well need to use more land to dispose of the additional excavated rock spoil but perhaps when that additional land has been landscaped over it could be resold?

So it depends how much the land is as a proportion of the SSE's costs. If land is a small part of their costs, if 20 similar sites to build on are just as cheap and easy to buy then my costs will be much more than proportional, since saving land won't save much money.

If land is scarce and valuable and the cost to purchase suitable land with a good chance to get permission to build on it is a significant proportion of the SSE's or anyone's costs to build 20 of their size of hydro dam schemes then my costs may be better than proportional. Sometimes securing suitable land for development can be very problematic, very expensive. Sometimes people won't sell their land. Sometimes the authorities won't agree that the land can be used in this way.

The SSE say that suitable sites for such pumped storage schemes are rare indeed, so land costs may be very significant and my scheme good value for money.

If indeed the cost of my scheme is somewhere around £20 billion it is likely to cost far more than the SSE or any electrical power supply company looking to their annual profits for the next few years could possibly afford.

Something like £20 billion I expect could only be found as a national public infrastructure project, spending government money, like the building of a large bridge or motorway would be.

A £20 billion government project would require Treasury approval, at least while Scotland is ruled as part of the UK.

I have suggested funding my much larger hydro dam scheme by re-allocating of some of the Bank of England's "Quantitative Easing" funds which amount to some £300 billion of new money printed with not much to show for it.

Any Questions?

OK, well I guess that's the vision part over. The rest is fairly straight-forward engineering I hope. Oh, and there is always getting the permission and the funding to build it of course which is never easy for anything this big.

OK, well if anyone has any questions or points to make about my vision or can say why they think the SSE plan is better than mine, or if you don't see why we need any pumped storage hydroelectric scheme at Coire Glas, whatever your point of view, if you have something to add in reply, please do.

Link to comment
Share on other sites

Geology of the Coire Glas site

I have been able to extract this information from the British Geological Survey (BGS) Geology of Britain viewer, from the 1:50 000 scale map.

coireglashydrogeology800.jpg

coireglashydrogeology.jpg

Click to see larger image

According to this map, the bedrock at the site which would be used to build the dam on top of and to extract rock from to create the tunnels for the underground complex seems to be a rock geologists call "psammite" which I understand to mean here "a metamorphic rock whose protolith was a sandstone".

What neither the map nor the "psammite" name is telling us is how fractured the psammite rock there is and therefore how strong and also how impermeable or otherwise to water this rock is likely to prove to be, both of which would be interesting for any engineers building a pumped-storage hydro dam scheme there to know.

What does look fairly obvious to me is that the superficial deposit of what the map calls "hummocky (moundy) glacial deposits - diamicton, sand and gravel" would not be strong enough, nor impermeable enough to build any dam on top of and at least along the line of the dam, this glacial deposit ought to be removed to get down to the bedrock within which to establish the foundations of the dam, although I would think that this glacial deposit might be made into aggregate to make the concrete for the dam by the sounds of it.

Link to comment
Share on other sites

If you are not (in your own words) able to claim an accurate cost estimate at this stage then why is the figure of £20 billion being banded about? Not sure why you are plucking this figure out other than you don't think it will be £2 billion or £200 billion - again arbitrary figures.

Link to comment
Share on other sites

It means it will be in the order of £20billion, so £22billion and £20billion are in the same order of magnitude. I take that figure to mean that Dow thinks it will be low ten's of billions (somwhere between £10 billion and £40billion, say.)

Although obviously he really has no fucking idea how much it will cost

Link to comment
Share on other sites

Who decides what is the same order of magnitude? Are we all just supposed to 'collectively' agree that £20 billion is the same order of magnitude as £22 billion because there's only a 2 in the difference (even though that's a whapping 2 billion)? Or is there an actual sliding scale which has been pre-defined by academics or via The Standard Method of Measurement or some other 'governing' body. Because unless there is then 'in the order of' is just waffle.

Link to comment
Share on other sites

Who decides what is the same order of magnitude? Are we all just supposed to 'collectively' agree that £20 billion is the same order of magnitude as £22 billion because there's only a 2 in the difference (even though that's a whapping 2 billion)? Or is there an actual sliding scale which has been pre-defined by academics or via The Standard Method of Measurement or some other 'governing' body. Because unless there is then 'in the order of' is just waffle.

Link to comment
Share on other sites

Order of magnitude is an idea that's applied pretty commonly in science. It's the number of numbers in the number..

I'll try and explain that without repeating the same word...

I don't know if you know of scientific notation for numbers, basically, you take the first digit, put a decimal point after, and times it by 10 to the relevant power so it'd be the right number of zeroes after.

So 20bn would be 2 x 10^10, 22bn would be 2.2 x 10^10.

Basically, the principle of 'order of magnitude' is that the size of the number matters more than the precise number itself. It's actually quite a useful tool.

Edited by Ed209
Link to comment
Share on other sites

@kaosmark2 - Thank you for trying to explain but maths is just one of my many weak points. I'll take your word for it that it can be a useful tool. I just don't 'see' how getting the right number of zeroes provides one with accuracy - especially if a thing has to be paid for!

@Ed209 - your latest post came up as I was writing this. Thanks also for having a bash at explaining it to me. Unfortunately many a maths teacher has gone valiantly before you trying to get this brain to understand even the most rudimentary of maths. Fortunately I have managed to forge a life not having to get involved with it.

Regards to both.

Link to comment
Share on other sites

@kaosmark2 - Thank you for trying to explain but maths is just one of my many weak points. I'll take your word for it that it can be a useful tool. I just don't 'see' how getting the right number of zeroes provides one with accuracy - especially if a thing has to be paid for!

@Ed209 - your latest post came up as I was writing this. Thanks also for having a bash at explaining it to me. Unfortunately many a maths teacher has gone valiantly before you trying to get this brain to understand even the most rudimentary of maths. Fortunately I have managed to forge a life not having to get involved with it.

Regards to both.

Link to comment
Share on other sites

Dam foundations and height of the dam above the bedrock

The top of the Dow-Dam has an elevation of 780 metres by design.

glacialdeposit.jpg

glacialdeposit.jpg

Image also hosted here

The lowest elevation of the current ground surface of Coire Glas along the line of the proposed dam is 463 metres and subtracting 463 from 780 is how the initial value of 317 metres for the nominal height of the dam above the existing surface used in previous diagrams was arrived at.

However, the glacial deposit of as yet unknown thickness is to be removed before building the foundations of the dam within and upon the bedrock.

Although the lowest surface elevation along the line of the dam of the bedrock too is unknown a formula relating the Height of the Dam Above the Bedrock (HDAB) to the Glacial Deposit Depth (GDD) can be easily stated.

HDAB = 317 + GDD

Examples.

If the GDD turns out to be 13 metres then the dam will be 330 metres tall.

If the GDD turns out to be 83 metres then the dam will be 400 metres tall.

damfoundation.jpg

damfoundation.jpg

Image also hosted here

I propose that the height of the Dow-Dam be as tall above the bedrock as it needs to be to keep the top of the dam at an elevation of 780 metres no matter how deep the removed glacial deposit layer turns out to be.

My approach may well differ from the SSE's approach. The SSE have said that their dam will be "92 metres" high and they may stick to that without having any goal for the elevation of the top of their dam.

As the diagram indicates, I propose to secure the Dow-Dam to the bedrock by massive piles inserted and secured into shafts which would be drilled into the bedrock.

Edited by Peter Dow
Link to comment
Share on other sites

That's where I have a problem - accuracy. Nearly all major construction projects go over budget, as well as time. If these 'tools' are being used then they have been proven in the field to be inaccurate - even when more advanced and detailed calculations are done at a later date.

Link to comment
Share on other sites

I have to admit that you are right there. People 'buy' construction contracts then send their Quantity Surveyors in to add every little detail as a variation to the costs. And as for last minute changes - don't get me started. I work as a surveyor in property maintenance and have seen it all - albeit on a much smaller scale than dam constructions.

Link to comment
Share on other sites

Guest
This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.

  • Latest Activity

    • In August 2009, in his Spectator blog he wrote about Harriet Harman, deputy leader of the Labour Party, in unflattering terms. Liddle began the article by asking: "So — Harriet Harman, then. Would you? I mean after a few beers obviously, not while you were sober."[27] Tanya Gold wrote in The Guardian that Liddle had delivered a "tissue-thin polemic." Pointing out that it was The Spectator's cover story that week.[28] Rachel Cooke in The Observer nearly two months later recalled finding Liddle's piece "disgusting"[29] Cooke went on to say: "I would still like to do something really unpleasant to the man who wrote [the article]." Liddle said two months later that the Harman column "was supposed to be a parody of guttural, base sexism", a joke he assumed readers would understand. After the negative response from Gold (and then Cooke, among other female journalists) he continued: "And then I suppose I came to the conclusion – gradually – that I must have got it wrong."[30] In June 2014, he said that of those he had offended, Harman was the one person to whom he would apologise.[31] In November 2009, again for The Spectator website, he offered "a quick update on what the Muslim savages are up to," a brief article about the stoning to death of a 20-year-old woman in Somalia after she was accused of adultery, and the similar death of a 13-year-old the year before. He made remarks, considered sarcastic, that read: "Incidentally, many Somalis have come to Britain as immigrants recently, where they are widely admired for their strong work ethic, respect for the law and keen, piercing, intelligence."[32][33] In December 2009, on his Spectator blog, Liddle referred to two black music producers, Brandon Jolie and Kingsley Ogundele, who had plotted to kill Jolie's 15-year-old pregnant girlfriend, as "human filth" and said the incident was not an anomaly. He continued: When he was accused of racism, Liddle said he was instead engaging in a debate about multiculturalism.[35][36] In March 2010 the Press Complaints Commission (PCC) upheld a complaint against Liddle, who became the first journalist to be censured over the contents of a blog, because he had not been able to prove his claim about the crime statistics.[37] After the publication of London crime figures in June 2010, The Sunday Telegraph suggested Liddle was largely right on some of his claims, but that he was probably wrong on his claims about knife crimes and violent sex crimes.[38] In October 2010, Liddle called for the abolition of the Welsh language TV channel S4C as a result of the 2010 Comprehensive Spending Review. In his article for The Spectator, he described Welsh nationalists as "miserable, seaweed munching, sheep-bothering pinch-faced hill-tribes".[39] On 23 May 2013, Liddle wrote about the murder of soldier Lee Rigby near the Royal Artillery Barracks in Woolwich, London. In the original version of a blog article for The Spectator, he referred to the perpetrators as "two black savages".[40] After many objections to his language use,[41] this phrase was modified.[42] Liddle apologised.[40][43] Giving a speech at Durham University in December 2021, Liddle said: "It is fairly easily proven that colonialism is not remotely the major cause of Africa's problems, just as it is very easy to prove that the educational underachievement of British people of Caribbean descent or African Americans is nothing to do with institutional or structural racism."[44] Independent editor rumour and Millwall supporters' website The Guardian reported on 8 January 2010 that the expected purchase of The Independent by Alexander Lebedev, a Russian billionaire, would be followed by the appointment of Liddle as editor.[45] Roy Greenslade wrote on 11 January that the reports were provoking a "major internal and external revolt" by The Independent's staff and readers.[46] The stories about Liddle's posts on Millwall Online apparently further reduced the likelihood of his being offered the job.[47] Finally, on 19 February, Stephen Brook of The Guardian reported that Liddle was no longer in the running for the post.[48] Tim Luckhurst, professor of journalism at the University of Kent, argued that Liddle's prospects of editing The Independent were nullified "by the people behind a viciously intolerant campaign of liberal bigotry".[49] In January 2010, the press drew attention to allegedly racist and misogynist comments posted under the username "monkeymfc"—a name Liddle has used—on Millwall Online, a fan club web forum with no official connection to Millwall Football Club. Liddle attributed some of the comments to opposition fans logging in under his name to embarrass him. He later said he had written some of the posts that were being criticised, including one in support of the BNP excluding Black and Asian people from the party.[50] Another post, in which he joked about not being able to smoke at Auschwitz,[51] led to his being asked to explain what he meant in The Jewish Chronicle.[47] While he said in June 2014 that his comments were taken out of context, he said that he did not regret making them. "No. Never. Absolutely not. I thought about my mates at Millwall Online, God I respect them so much more than these other people, these ghastly f**king people."[31] Stephen Lawrence, disabled and transgender people In November 2011, an article by Liddle for The Spectator suggested the trial of two men accused (and later convicted) of murdering Stephen Lawrence would not be fair.[52] It was referred to the Attorney General Dominic Grieve by the judge for possible contempt of court,[53] and he ordered the jurors not to read it. Having decided that it might have breached a court order, Grieve passed the case on to the Crown Prosecution Service and the Director of Public Prosecutions.[54] The decision that The Spectator was to be prosecuted by the CPS for breaching reporting restrictions was announced on 9 May 2012, with a court hearing scheduled for 7 June, although Liddle as the author was not himself liable for prosecution. Fraser Nelson, the magazine's editor, announced that the prosecution would not be contested,[55] and the magazine pleaded guilty at the hearing. The fine was £3,000, plus £2,000 compensation to Stephen Lawrence's parents and £625 costs.[56] In January 2012, Liddle wrote that many people in the UK were "pretending to be disabled" in his column for The Sun,[57] an opinion defended by James Delingpole.[58] Frances Ryan in The Guardian accused him of "belittling something that on a daily basis affects real people" who can be "a huge benefit to society. Maybe for a month Liddle would like to try that."[59] In May 2015, the Independent Press Standards Organisation (IPSO) upheld a complaint from Trans Media Watch that Liddle had been discriminatory towards Emily Brothers, a blind and transgender Labour candidate at the 2015 general election, in two Sun columns published in December 2014 and January 2015. In commenting in the way he had Liddle had breached two sections of the editors' code.[60][61] Column on poppers and gay sex During a parliamentary debate on the Psychoactive Substances Bill – which "makes it an offence to produce, supply, offer to supply, possess with intent to supply, possess on custodial premises, import or export psychoactive substances"[65] the Conservative politician Crispin Blunt admitted he used poppers: Liddle responded in his Spectator blog: The satirical and current affairs magazine Private Eye described this as hypocritical, pointing out Liddle's account in The Sunday Times of using Viagra in July 2004.[68][69] A spokesperson from the LGBT rights charity Stonewall said of Liddle's remarks: "Comments like this are shocking and damaging, but we wouldn't expect anything less from repeat offending bigots like Rod Liddle."[70] Column on Muslim voters In October 2019, Liddle penned a column in The Spectator commenting on the forthcoming December 2019 UK general election, which suggested that the election should be held on a Muslim holy day to reduce the Labour vote. The column was criticised by senior political figures including Chancellor of the Exchequer Sajid Javid and former Conservative Deputy Prime Minister David Lidington. Liddle defended the content as being humorous. The article also criticised the Labour MP Rosie Duffield's recent speech about her experience of trying to exit an abusive relationship; Duffield described the article as "racist and misogynistic".[74]
    • A true social democrat
    • I thought the same thing I thought when Baresi went which is there sure is a hell of alot of people who don't make the new pension age.
    • 1, The Menzingers- Everything I Ever Saw 2, Quicksand- Bring On The Psychics 3, Radkey- Bedroom Sand  
  • Featured Products

  • Hot Topics

  • Latest Tourdates

×
×
  • Create New...