Hydro dam energy stores for 100% renewable power

In future, we won't need any coal, oil or gas burning or nuclear power stations, at all.

All we'll need to generate all the electrical power we'll ever need is renewable energy from wind, tidal, wave, solar and other renewable sources of energy and a good place to store our surplus renewable energy for later use.

A good way to store energy where you have steep hills and water is to build pumped-storage hydroelectricity dams, reservoirs and power stations.

Scotland is such a place with plenty of steep hills and water. Scotland is the land of the mountain and the flood. So where better to develop the art of building pumped storage hydro?

Scotland best for pumped-storage hydroelectricity energy economy

This is a statement of the obvious as far as Scottish electrical power-generation engineers and scientists are concerned I expect but I am making this statement anyway, not for the benefit of our scientists or engineers but to inform the political debate about the potential of the Scottish economy "after the North Sea oil runs out" because political debate involves mostly non-scientists and non-engineers who need to have such things explained to them.

The Scottish economy has a profitable living to make in future in the business of electrical energy import/export from/to English electrical power suppliers and perhaps even to countries further away one day.

The tried and tested engineering technology we Scots can use in future to make money is pumped-storage hydroelectricity.

Wikipedia: Pumped-storage hydroelectricity

The technique is currently the most cost-effective means of storing large amounts of electrical energy on an operating basis, but capital costs and the presence of appropriate geography are critical decision factors.

Edited by Peter Dow
Link to comment
Share on other sites

My vision for a LARGER hydro dam at Coire Glas, Scotland than SSE's

I am presenting here my vision for a large pumped storage hydroelectric 2-square kilometres surface-area reservoir and 300+ metre tall dam which I have designed for the Coire Glas site, Scotland.

(View site using Google Earth where the convenient label is "Loch a' Choire Ghlais" )

I was inspired to conceive and to publish my vision by learning of the Scottish and Southern Energy (SSE) proposal to build a smaller hydroelectric pumped-storage scheme at Coire Glas which has been presented to the Scottish government for public consultation.

I have not long been aware of the SSE plan for the Coire Glas scheme, not being a follower of such matters routinely, but I was prompted by an earlier tangentially-related news story (about energy storage technology for renewable energy generators such as wind farms) to write to Members of the Scottish Parliament on the merits and urgency of new pumped storage hydroelectric power for Scotland on 14th February and a reply from Ian Anderson, the parliamentary manager for Dave Thomson MSP received the next day, the 15th February informed me about the SSE plan and Ian added "initially scoped at 600MW but, to quote SSE, could be bigger!"

I replied to Ian "So the schemes proposed by the SSE are welcome and ought to be green-lighted and fast-tracked, but I am really proposing that Scots start thinking long term about an order of magnitude and more greater investment in pumped storage hydroelectric capacity than those SSE plans."

So I had in mind "bigger would be better" but it was not until the next day on the 16th February when a news story informed me that the SSE plans had been submitted to the Scottish government for public consultation that I thought "this needs consideration now".

So starting late on the night of the 17th, early 18th February and all through the weekend, I got busy, outlining my alternative vision for a far bigger dam and reservoir at the same location.

So this is my vision as inspired by the SSE plan. If my vision is flawed then the fault is mine alone. If my vision is brilliant, then the brilliance too is mine. :D

peterdowcoireglasproposal.jpg

peterdowcorieglasproposal.jpg

Image also hosted on postimage

The black contour line at 550 metres elevation shows the outline of the SSE proposed reservoir of about 1 square kilometre surface-area and the grey thick line shows the position of the proposed SSE dam which would stand 92 metres tall and would be the tallest dam in Scotland and indeed Britain to date though it seems our dams are several times smaller than the tallest dams elsewhere in the world these days.

Part of the red contour line at 775 metres elevation, where the red line surrounds a blue shaded area, blue representing water, shows the outline of my larger reservoir of about 2 square kilometres surface-area and the thicker brown line shows the position of my proposed dam which would stand 317 metres tall which would be one of the tallest man-made dams in the world, 1475 metres long and about 72 million cubic metres in volume.

Enhanced satellite photograph

enhancedsatellite.jpg

enhancedsatellite.jpg

Image also hosted on PostImage.Org

Edited by Peter Dow
Link to comment
Share on other sites

Cross section of the Dow-dam

The Dow-dam would be more than 3 times higher than the proposed SSE-dam. In this diagram, a horizontal line one third of the way up the Dow-dam indicates the relative height of the SSE dam although it is not aligned with this cross-section.

dowdam.jpg

dowdam.jpg

Image also hosted on PostImage.Org

Maps showing the line of cross-section viewed from each side

damwatersidemap700.jpg

damwatersidemap700.jpg

Image also hosted on PostImage.Org

Link to comment
Share on other sites

damdrysidemap700.jpg

damdrysidemap700.jpg

Image also hosted on PostImage.Org

Cross section of the Dow-dam reservoir

damcrosssectionmajordiameter.jpg

Cross section along the major diameter of the elliptical excavation of the reservoir bed

damcrosssectionmajordiameter.jpg

Also hosted on PostImage.org

The Upper Reservoir

The green ellipse of major diameter of 1.5 kilometres and minor diameter of 1 kilometre represents an excavated reservoir bed, as flat and as horizontal as practical, at an elevation of 463 metres.

Since an excavated reservoir bed is not, that I can see, part of the SSE plan, at any size, I will provide some more information about my vision for that now.

The basic idea of excavating a flat or flattish reservoir bed is to increase the volume of the water stored in the reservoir because more water means more energy can be stored.

Capacity of the reservoir, energy stored and power supplied

Excavating around 138 million cubic metres of rock increases the volume of the reservoir so created to about 400 million cubic metres, achieving a theoretical energy storage capacity of more than 600 GigaWatt-Hours and it ought to be possible to excavate enough rock to achieve a practical 600GW.Hrs electrical energy supplied.

Accordingly, I envision it would be appropriate and useful to install the required turbine-pumps to supply up to 12 GigaWatts of electrical power to the grid for up to 50 hours before the energy store would be exhausted.

Excavation details

Depending on the geology and strength of the rock of Coire Glas the walls of the reservoir bed perimeter could be as steep as vertical from the reservoir bed up to the natural elevation of the existing rock surface which would mean, presumably, blasting out rock to create a cliff which at places could be as much as about 290 metres tall.

Near the dam, the reservoir bed perimeter wall would be only 40 metres or less tall. The further from the dam, the higher the wall will be and the more rock needs to be excavated.

A vertical reservoir bed perimeter wall would be ideal to maximise reservoir volume wherever the geology provides a strong stone which can maintain a vertical wall face without collapse, (a stone such as granite perhaps). Ideally this would allow about 138 million cubic metres to be excavated to flatten the reservoir bed.

Where the geology only provides a weaker stone then a sloping perimeter wall at a suitable angle of repose for reliable stability would be constructed.

So the reservoir perimeter wall could be as sloped as shallow as 45 degrees from the natural elevation at the perimeter of the eclipse sloping down to the reservoir bed at 463 metres elevation in the case of the weakest and most prone to collapse kinds of stone.

Exactly how strong the stone is at each location I guess we'll only find out absolutely for sure if and when engineers start blasting it and testing the revealed rock wall face for strength.

The shape of the perimeter of the excavated reservoir bed is not absolutely critical. So long as it ends up as a stable wall or slope, however it is shaped by the blasting, it will be fine. There is no need to have stone masons chip the perimeter smooth and flat! The ellipse is simply the easiest approximate mathematical shape to describe and to draw. If the end result is not a perfect ellipse, don't worry, it will be fine!

Link to comment
Share on other sites

Loch Lochy and vicinity water flow control works

Here is an annotated satellite photograph of the land south from Coire Glas showing Loch Lochy, Loch Arkaig, the isthmus between the lochs, Mucomir where Loch Lochy empties into the River Spean before it flows on as the River Lochy, the Caledonian Canal and Fort William where the river flows into a sea loch.

lochywater768.jpg

lochywater768.jpg

Click to see larger image

New waterway

Loch Lochy is separated from a neighbouring loch, Loch Arkaig, by a 2 km wide isthmus, which I have identified on this map as "the Achnacarry Bunarkaig isthmus", after the local place names.

It ought to be quite straight forward to build a canal or culvert, to connect those two lochs. The idea is that the new waterway would be wide and deep enough, enough of a cross section area under water, perhaps hundreds of square metres, so as to allow free flow from one loch to the other, so as to equalise the surface elevations of the two lochs, so as to increase the effective surface area of Loch Lochy so as to decrease the depth changes to Loch Lochy when water flows in from the Coire Glas reservoir when it discharges water when supplying power.

Now, Loch Arkaig has a natural surface elevation of 43 metres and this would be lowered to that of Loch Lochy. The surface area of Loch Arkaig is given by wikipedia as 16 km^2 also, (though it looks to me somewhat smaller than Loch Lochy). In addition, partially draining Loch Arkaig to bring its level down to that of Loch Lochy will also reduce its surface area.

If say, the additional surface area of Loch Arkaig is about 10 km^2 added to Loch Lochy's 16 km^2 this would give an effective surface area of 26 km^2 and reduce the potential depth variation to

Potential depth variation of Loch Lochy + Loch Arkaig = 400 000 000 m^3 / 26 000 000 m^2 = 15.3 metres.

Without equalising the loch levels, the depth changes to Loch Lochy that would require to be managed may be potentially more like 25 metres than 15 metres. So the new waterway is an important part of the new water flow control works that Coire Glas/Dow requires to be constructed.

Additional Loch Lochy water level control measures

When the Coire Glas reservoir is full, then the water level of Loch Lochy should be prevented, by new water works - drains, dams, flood barriers etc. - from rising due to rainfall and natural flow into the loch above a safe level which allows for the reservoir to empty into the loch without overflowing and flooding.

The safe "upper-reservoir-full" loch level will likely turn out to be around about 15 metres below the maximum loch level.

The next diagram showing the new loch drain and the reservoir pump inlets indicates how this might be achieved.

lochyflow768.jpg

lochyflow.jpg

Click to see larger image

The drain from Loch Lochy to the sea which goes underground from the 14 m elevation level in the loch would need capacity for the usual outflow from Loch Lochy which currently goes through the Mucomir hydroelectric station.

I have estimated the flow through Mucomir from its maximum power of 2MegaWatts and its head of 7m as somewhere near 0.2 Mega-cubic-metres-per-hour and compared that value using a spreadsheet I have written to predict the capacity of water flow through different sizes of drains using the empirical Manning formula and this is also useful for determining the appropriate size of the new water channel between the lochs.

Ease my quantity :D

To construct Coire Glas/Dow/600GW.Hrs/12GW may cost of the order of around £20 billion, but that would be my order of magnitude educated guess more than a professional cost estimate.

In other words, I'm only really confident at this early "vision" stage that the cost would be closer to £20 billion than it would be to £2 billion or to £200 billion but I'm not claiming to be able to quote an accurate cost estimate at this stage.

I have not itemised my costs - how much for land, how much for labour, how much for trucks, how much for diggers, how much for cement, how much to install the generators etc. and the SSE have not published itemised costs for theirs either so I can't calculate my costs in a proportion to the SSE's costs.

Although my version offers 600 GigaWatt-Hours energy and 12 GigaWatts power (or 20 times the capacity and performance) some of the items in my version would cost more than "in proportion", in other words more than 20 times the SSE's cost.

For example, the cost of my dam will be more like 27 times the cost of the SSE's dam. (3.44 times higher and thicker and 2.27 times longer).

For example, the cost of excavating 400 million tonnes of rock from the reservoir bed to increase the capacity of the reservoir to hold water (and energy) in my version won't be in proportion to the SSE costs for excavating their reservoir bed because, as far as I know, they don't plan to excavate their reservoir bed at all.

On the other hand, my land costs are about the same as the SSE's - much less than in proportion. I may well need to use more land to dispose of the additional excavated rock spoil but perhaps when that additional land has been landscaped over it could be resold?

So it depends how much the land is as a proportion of the SSE's costs. If land is a small part of their costs, if 20 similar sites to build on are just as cheap and easy to buy then my costs will be much more than proportional, since saving land won't save much money.

If land is scarce and valuable and the cost to purchase suitable land with a good chance to get permission to build on it is a significant proportion of the SSE's or anyone's costs to build 20 of their size of hydro dam schemes then my costs may be better than proportional. Sometimes securing suitable land for development can be very problematic, very expensive. Sometimes people won't sell their land. Sometimes the authorities won't agree that the land can be used in this way.

The SSE say that suitable sites for such pumped storage schemes are rare indeed, so land costs may be very significant and my scheme good value for money.

If indeed the cost of my scheme is somewhere around £20 billion it is likely to cost far more than the SSE or any electrical power supply company looking to their annual profits for the next few years could possibly afford.

Something like £20 billion I expect could only be found as a national public infrastructure project, spending government money, like the building of a large bridge or motorway would be.

A £20 billion government project would require Treasury approval, at least while Scotland is ruled as part of the UK.

I have suggested funding my much larger hydro dam scheme by re-allocating of some of the Bank of England's "Quantitative Easing" funds which amount to some £300 billion of new money printed with not much to show for it.

Any Questions?

OK, well I guess that's the vision part over. The rest is fairly straight-forward engineering I hope. Oh, and there is always getting the permission and the funding to build it of course which is never easy for anything this big.

OK, well if anyone has any questions or points to make about my vision or can say why they think the SSE plan is better than mine, or if you don't see why we need any pumped storage hydroelectric scheme at Coire Glas, whatever your point of view, if you have something to add in reply, please do.

Link to comment
Share on other sites

Geology of the Coire Glas site

I have been able to extract this information from the British Geological Survey (BGS) Geology of Britain viewer, from the 1:50 000 scale map.

coireglashydrogeology800.jpg

coireglashydrogeology.jpg

Click to see larger image

According to this map, the bedrock at the site which would be used to build the dam on top of and to extract rock from to create the tunnels for the underground complex seems to be a rock geologists call "psammite" which I understand to mean here "a metamorphic rock whose protolith was a sandstone".

What neither the map nor the "psammite" name is telling us is how fractured the psammite rock there is and therefore how strong and also how impermeable or otherwise to water this rock is likely to prove to be, both of which would be interesting for any engineers building a pumped-storage hydro dam scheme there to know.

What does look fairly obvious to me is that the superficial deposit of what the map calls "hummocky (moundy) glacial deposits - diamicton, sand and gravel" would not be strong enough, nor impermeable enough to build any dam on top of and at least along the line of the dam, this glacial deposit ought to be removed to get down to the bedrock within which to establish the foundations of the dam, although I would think that this glacial deposit might be made into aggregate to make the concrete for the dam by the sounds of it.

Link to comment
Share on other sites

If you are not (in your own words) able to claim an accurate cost estimate at this stage then why is the figure of £20 billion being banded about? Not sure why you are plucking this figure out other than you don't think it will be £2 billion or £200 billion - again arbitrary figures.

Link to comment
Share on other sites

It means it will be in the order of £20billion, so £22billion and £20billion are in the same order of magnitude. I take that figure to mean that Dow thinks it will be low ten's of billions (somwhere between £10 billion and £40billion, say.)

Although obviously he really has no fucking idea how much it will cost

Link to comment
Share on other sites

Who decides what is the same order of magnitude? Are we all just supposed to 'collectively' agree that £20 billion is the same order of magnitude as £22 billion because there's only a 2 in the difference (even though that's a whapping 2 billion)? Or is there an actual sliding scale which has been pre-defined by academics or via The Standard Method of Measurement or some other 'governing' body. Because unless there is then 'in the order of' is just waffle.

Link to comment
Share on other sites

Who decides what is the same order of magnitude? Are we all just supposed to 'collectively' agree that £20 billion is the same order of magnitude as £22 billion because there's only a 2 in the difference (even though that's a whapping 2 billion)? Or is there an actual sliding scale which has been pre-defined by academics or via The Standard Method of Measurement or some other 'governing' body. Because unless there is then 'in the order of' is just waffle.

Link to comment
Share on other sites

Order of magnitude is an idea that's applied pretty commonly in science. It's the number of numbers in the number..

I'll try and explain that without repeating the same word...

I don't know if you know of scientific notation for numbers, basically, you take the first digit, put a decimal point after, and times it by 10 to the relevant power so it'd be the right number of zeroes after.

So 20bn would be 2 x 10^10, 22bn would be 2.2 x 10^10.

Basically, the principle of 'order of magnitude' is that the size of the number matters more than the precise number itself. It's actually quite a useful tool.

Edited by Ed209
Link to comment
Share on other sites

@kaosmark2 - Thank you for trying to explain but maths is just one of my many weak points. I'll take your word for it that it can be a useful tool. I just don't 'see' how getting the right number of zeroes provides one with accuracy - especially if a thing has to be paid for!

@Ed209 - your latest post came up as I was writing this. Thanks also for having a bash at explaining it to me. Unfortunately many a maths teacher has gone valiantly before you trying to get this brain to understand even the most rudimentary of maths. Fortunately I have managed to forge a life not having to get involved with it.

Regards to both.

Link to comment
Share on other sites

@kaosmark2 - Thank you for trying to explain but maths is just one of my many weak points. I'll take your word for it that it can be a useful tool. I just don't 'see' how getting the right number of zeroes provides one with accuracy - especially if a thing has to be paid for!

@Ed209 - your latest post came up as I was writing this. Thanks also for having a bash at explaining it to me. Unfortunately many a maths teacher has gone valiantly before you trying to get this brain to understand even the most rudimentary of maths. Fortunately I have managed to forge a life not having to get involved with it.

Regards to both.

Link to comment
Share on other sites

Dam foundations and height of the dam above the bedrock

The top of the Dow-Dam has an elevation of 780 metres by design.

glacialdeposit.jpg

glacialdeposit.jpg

Image also hosted here

The lowest elevation of the current ground surface of Coire Glas along the line of the proposed dam is 463 metres and subtracting 463 from 780 is how the initial value of 317 metres for the nominal height of the dam above the existing surface used in previous diagrams was arrived at.

However, the glacial deposit of as yet unknown thickness is to be removed before building the foundations of the dam within and upon the bedrock.

Although the lowest surface elevation along the line of the dam of the bedrock too is unknown a formula relating the Height of the Dam Above the Bedrock (HDAB) to the Glacial Deposit Depth (GDD) can be easily stated.

HDAB = 317 + GDD

Examples.

If the GDD turns out to be 13 metres then the dam will be 330 metres tall.

If the GDD turns out to be 83 metres then the dam will be 400 metres tall.

damfoundation.jpg

damfoundation.jpg

Image also hosted here

I propose that the height of the Dow-Dam be as tall above the bedrock as it needs to be to keep the top of the dam at an elevation of 780 metres no matter how deep the removed glacial deposit layer turns out to be.

My approach may well differ from the SSE's approach. The SSE have said that their dam will be "92 metres" high and they may stick to that without having any goal for the elevation of the top of their dam.

As the diagram indicates, I propose to secure the Dow-Dam to the bedrock by massive piles inserted and secured into shafts which would be drilled into the bedrock.

Edited by Peter Dow
Link to comment
Share on other sites

That's where I have a problem - accuracy. Nearly all major construction projects go over budget, as well as time. If these 'tools' are being used then they have been proven in the field to be inaccurate - even when more advanced and detailed calculations are done at a later date.

Link to comment
Share on other sites

I have to admit that you are right there. People 'buy' construction contracts then send their Quantity Surveyors in to add every little detail as a variation to the costs. And as for last minute changes - don't get me started. I work as a surveyor in property maintenance and have seen it all - albeit on a much smaller scale than dam constructions.